| WALLS FINISH | |
| Internal | All internal walls will be plastered and finished with fine punning/P.O.P. |
| External | Exquisitely designed classical exterior finished in Terracoat/santaxmat. |
| FLOORING | |
| Drawing/Dining | Vitrified Tiles |
| Bedrooms | Ceramic Tiles |
| Balconies | Ceramic Tiles |
| TOILETS | |
| Walls | Ceramic Tiles upto a height 7 ft. |
| Flooring | Ceramic Tiles |
| Fittings | A wash basin, mirror, towel rail and soap dish. Bath fittings of standard make. |
| Sanitary ware | Vitreous white ceramic sanitary ware of standard make. Cistern will be of PVC. |
| Hot & Cold Water | Provision for hot & cold water supply in the all toilets. |
| KITCHEN | |
| Flooring | Ceramic Tiles |
| Platform | A working platform in black granite with stainless steel kitchen sink and provision for hot and cold water supply. |
| Wall | 2 ft. ceramic tiles dado above working platform with point for aquaguard. |
| WINDOWS | Sliding aluminum windows with steel grill and 4 mm glass. |
| DOORS | |
| Main Door | Molded skin door painted with mortice lock, magic eye and decorative brass handles. |
| Other Door | 30 mm thick flush doors of hardwood, painted with 2 coats of synthetic enamel paint. |
| ELECTRICAL | |
| Fittings | Modular electrical switches and sockets. |
| Wiring | All electrical wiring in concealed conduits with copper wires. Convenient provision and distribution of light and power plugs. |
| WATER SUPPLY | Through deep tube wells and required numbers of overhead tank or a suitable located water tower. |
| GENERATOR | Suitable capacity to provide 750 watts emergency supply to each unit. |
| TELEPHONE/TV | In Drawing/Dining room and master bedroom. |
| LIFT | A passenger lift in each block of G+4 stories with generator back up. |
| STAIRCASE | Flooring combination of tiles and kota stone. |
| OTHER FACILITIES | Washing machine point with water inlet and outlet at a convenient location. |
Private Banks : HDFC
Nationalized Banks : SBI, LIC Housing
April 03, 2010
Work Progress for Phase – I
We have great pleasure to share the development being taking place in Ashiana Brahmananda during last 3 months.
Structure work fully completed for Emerald block E-025 to E-428. Brick work is in progress. Third roof casting for Emerald block E-077 to E-480 is in progress. Brick work for Ruby R-015 to R-416 completed. Internal plaster is in progress. Brick work for Perl P-009 to P-412 is in progress.
We are attaching latest photograph of site so that you can know the development taken place.
Referral scheme launched during last quarter, received very good response.
Prices have been revised with effect from 02 April 2010.
Hope the above details will give an insight view of the progress of construction and keep you updated.