Salient Features
  • Accommodation: G+4 stories with 2 & 3 BHK apartments with lift.
  • Design: Efficiently designed units for better space management.
  • Recreation Facility: Gymnasium, pool table, multipurpose hall, badminton etc.
  • Swimming Pool: Swimming pool for relaxation & fun with family.*
  • Power Supply: Power supply through JSEB backed by 750 watt of stand by power in each unit from central generator.
  • Water Supply: Ample water supply from own tube well.
  • Security: 24-hours internal security with intercom.
  • Telephone: Additional telephone cabling in each flat to enable Internet connectivity.
  • Landscaping: Professional landscaping with 2 acre parks, walking tracks, fountains and trees all around the complex.
  • Services: Well lit roads, underground pipelines for water and sewerage and concealed cabling for telephone, electricity and TV.
  • Hygiene: In house sewerage treatment plant* to ensure an environment friendly complex. Recycled water to be used in horticulture towards environment conservation.
  • Eco-friendly: Rain water harvesting system in place to preserve our natural resources.
  • Car Parking: Option of covered as well as open car parking will be provided*
  • Maintenance: High quality maintenance assured by subsidiary of Ashiana*
  • Housing Finance: Available from all major financial institutions and bank like HDFC, SBI etc.

 

ˆˆTop
Floor Layout Map

 

ˆˆTop
Specifications

APARTMENTS
 WALLS FINISH
 Internal  All internal walls will be plastered and finished with fine punning/P.O.P.
 External  Exquisitely designed classical exterior finished in Terracoat/santaxmat.
 FLOORING
 Drawing/Dining  Vitrified Tiles
 Bedrooms  Ceramic Tiles
 Balconies  Ceramic Tiles
 TOILETS
 Walls  Ceramic Tiles upto a height 7 ft.
 Flooring  Ceramic Tiles
 Fittings  A wash basin, mirror, towel rail and soap dish. Bath fittings of standard make.
 Sanitary ware  Vitreous white ceramic sanitary ware of standard make. Cistern will be of PVC.
 Hot & Cold Water  Provision for hot & cold water supply in the all toilets.
 KITCHEN
 Flooring  Ceramic Tiles
 Platform  A working platform in black granite with stainless steel kitchen sink and provision for hot and cold water supply.
 Wall  2 ft. ceramic tiles dado above working platform with point for aquaguard.
 WINDOWS  Sliding aluminum windows with steel grill and 4 mm glass.
 DOORS
 Main Door  Molded skin door painted with mortice lock, magic eye and decorative brass handles.
 Other Door  30 mm thick flush doors of hardwood, painted with 2 coats of synthetic enamel paint.
 ELECTRICAL
 Fittings  Modular electrical switches and sockets.
 Wiring  All electrical wiring in concealed conduits with copper wires. Convenient provision and distribution of light and power plugs.
 WATER SUPPLY  Through deep tube wells and required numbers of overhead tank or a suitable located water tower.
 GENERATOR  Suitable capacity to provide 750 watts emergency supply to each unit.
 TELEPHONE/TV  In Drawing/Dining room and master bedroom.
 LIFT  A passenger lift in each block of G+4 stories with generator back up.
 STAIRCASE  Flooring combination of tiles and kota stone.
 OTHER FACILITIES  Washing machine point with water inlet and outlet at a convenient location.



Some specifications are at extra cost & some are included in the maintenance cost.

Refer the e-brochure for Upgrade features.

 

ˆˆTop
Financing Options

Private Banks            :  HDFC

Nationalized BanksSBI, LIC Housing

 

ˆˆTop
Project Status

 

          

April 03, 2010

Ashiana Brahmananda


Work Progress for Phase – I


We have great pleasure to share the development being taking place in Ashiana Brahmananda during last 3 months.

 


Structure work fully completed for Emerald block E-025 to E-428. Brick work is in progress. Third roof casting for Emerald block E-077 to E-480 is in progress. Brick work for Ruby R-015 to R-416 completed. Internal plaster is in progress. Brick work for Perl P-009 to P-412 is in progress.

 


Plantation is taking place. By the end of rainy season, it will look green all around.

 


We are attaching latest photograph of site so that you can know the development taken place.

 


Referral scheme launched during last quarter, received very good response.

 


Prices have been revised with effect from 02 April 2010.  

 


Hope the above details will give an insight view of the progress of construction and keep you updated.

            

 

 

 